Friday 21 August 2015

what is cost center accounting in sap co

COST CENTER ACCOUNTING

This is used to view department wise costs we use cost center accounting.
  1. Creation of primary cost elements, we can create
A) FI Area                              |
B)CO Area                              |-à Co Area
C)Automatic creation             |

  1. Display cost elements created
  2. Creation of filed status group by making cost center required entry field
  3. Assign new filed status group in GL expenditure accounts
  4. Creation of cost centers.
  5. Creation of cost center groups.
  6. Creation of cost element groups
  7. To enter exchange rate for type M for INR to Euro
  8. Posting of transaction in FI
  9. To view cost center wise report.
  10. To view CO documents

  1. A) Creation of primary cost element at FI area
Use to FS00 – GL masters creation
Give the GL account number : 400100 Salaries Account
Company code                        : BIL
Form the menu select GL Account display
Now select edit cost element button
Valid from date                      :01.04.2008
To date                                    :31.12.9999 comes automatically
Enter
Cost element category                        : Select 1 (Primary cost / cost reducing revenues)
Select save button or Ctrl+S

  1. B) Creation of Primary cost element at CO area:
Use transaction code FS00

Path: Accounting- Controlling- Cost element accounting-Master data-Cost element –Individual processing-Create primary  (Tr.code KA01 )

Cost element               : 400300 Rent Account
Valid from                  :01.04.2008     to 31.12.9999
Enter
Cost element category                        :1 (primary cost /cost reducing revenue)
Save

    1. C) Automatic  creation of primary cost elements:

1)      Marked default settings (OKB2)

path : SPRO-Controlling-Cost element accounting-Master data – Cost elements –Automatic creation primary and secondary cost elements-Make default settings.(Tr.code is OKB2)

Give the chart of Accounts : BIL
Enter
Account from              :400301
Account to                  :499999
Cost element category select 1
Save
Press enter to save in your request

Create batch input session (OKB3)
Same path as above
Give the controlling area         : BIL
Valid from                              :01.04.2008
Valid to                                   :31.12.1999
Session name                           :BIL (This is text field)
Execute

Execute batch input session (Tr code is SM35)

Same path as above
Select session name                 : BIL
Select process button
Select session                          :BIL
Select display errors only radio button
Select process button
We get a message processing of batch input session completed.
Ignore the message & select exit batch input button



Display primary cost elements created (KA03)

Path: Accounting-Controlling-Cost element accounting-Mater data-Cost element –Individual processing – Display- (Tr code is KA03)

Select drop down button beside cost element
Give the Controlling area : BIL
Enter

Creation of field status group by making cost center required entry field: (Tr.Code is OBC4)

Select field status variant: BIL
Double click on filed status groups folder

100000 equity share capital G001      We can’t make cost center required for balance sheet accounts

400100 Salaries Account                    G001
                                                            For G004 we make cost center required and assign in salaries account (i.e in expenditure accounts)

Double click on field status group G004 cost accounts
Double click on General data
Text make it required entry field
Select next group button
Cost center select required entry filed
Select next page or page down button two times.
Business area make it option entry filed
Save

Press enter to save in your request

Assign group new field group in GL expenditure accounts (FS00)

Give the GL account 400100 salaries account
Company code                                    :BIL
From the menu select GL account change select create / Bank / Interest tab
Filed status group change to G004
Save
Give the GL Account No.400300 Rent A/c
Company code                                    :BIL   
From the menu select GL account change
Change field status group to G004
Save

Creation of cost centers:

Path: Accounting-Controlling-Cost center accounting-Master data-Cost center-Individual processing-create (Tr.code is KS01)

Cost center                                          : Dept A
Valid from                                          :01.04.2008 to 31.12.9999
Enter
Give the name                                     : Dept A
Give the description                            : Dept A
Person responsible                               :Mr.A
Cost center category                           : Select 1 production
Hierarchy area                                     : select BILHIER
Business area                                       :BILH
Currency                                             :INR
Select save button or Ctrl+S
Ignore the warning message press enter
One more cost center                          : Dept B
Valid from                                          :01.04.2008 to 31.12.9999
Reference cost center                          : Dept A
Controlling area                                  : BIL
Enter
Change the name to Dept B
Change the description to cost center Dept B
Change the person responsible            : Mr B
Other fields are common
Select save button
Ignore the warning message press enter
Cost center                                          : Dept C
Valid from                                          :01.04.2008 to 31.12.9999
Reference cost center                          : Dept A
Controlling area                                  : BIL
Enter
Change the name to                            : Dept C
Change the description to cost center : Dept C
Change person responsible to Mr.C
Cost center category                           : Select to  2 (service cost center)
Select save button or Ctrl+s
Ignore the warning message press enter

 Creation cost center groups:
Hierarchy                                            : BILHIER
Cost centers         Dept A     Dept B    Dept C     Dept X        Dept Y       Dept Z
Category              Production  Prod   Service       Production   Production  Service
Business Area       HYD       HYD     HYD       BGL            BGL          BGL       

If we want to see all cost centers data – BILHIER

If we want to see production cost centers data – Create a cost center group and assign Dept A . Dept B, Dept X and Dept Y.

If we want to see HYD cost centers data cost – cost center group and assign Dept A, Dept b and Dept C

If we want so settled production cost centers data – create  A cost center group and assign Dept A and Dept B

Path : Accounting – Controlling – Cost center accounting – Master data- Cost center group – Create (Tr.code is KSH1)

Give the cost center name       : BILHYD PROD
Enter
Description Hyderabad  production cost centers BIL
Select Edit à Cost Center à Insert cost center button
Select the cost centers Dept A
 Dept B
Save

Creation of cost Element group:

FI : Account groups  Personnel cost
CO:Dept wise personal cost or Administration

400100 salaries
Create cost element group personnel and assign 400100 -400199
400101 Wages


400102 Bonus


400103 Staff welfare and Administration
Create cost element group administration and assign 400300-400399
400300 Rent

400301 Telephone exp

400302 Petrol exp
In the report center Dept A Dept C
Or
Cost center GRP
Cost element
Or
Cost element GRP personnel administration

  Path: Accounting –Controlling-Cost center accounting-Master data-Cost element group –Create (Transaction code: KAH1)

Cost element group name : BILADMIN
Enter
Description : Administration expenses for BIL
Select insert cost element button (Shift+F4) (Edit –Cost element –Insert cost element)
From 400300 to 400399
Save

To enter exchange rate for type M for INR to EURO (Tr.Code is OB08)

Select new entries button
Exchange rate type                 : M (Average rate)
Valid from                              :01.10.2008
From currency                         : INR
To                                            : EUR
Direct quotation                      :0.02
Select save button or Ctrl+S
Press enter to save in your request

Posting of transaction in FI Transaction code:F-02

Give the document date         : Today’s date
Type                                        :SA
Company code                        :BIL
Posting key                             :40
Account                                  :400100 salaries account
Enter
Give the amount                     :500000
Cost center                              : Dept A
Text                                         :Salaries posting

 One more expenditure

Post key                                  :40
Account                                  :400300 Rent account
Enter
Amount                                   :100000
Cost center                              : Dept A
Text                                         : Rent posting
Posting key                             : 50
Account                                  :200105 SBI current account
Enter
Amount                                   :*
Business area                           :BILH
Text                                         : Expenditure posting
From the menu select Document à Simulate
Select save button or Ctrl+S

To view cost center wise report:

Path: Accounting –Controlling-cost center accounting –Information system-Report for cost center accounting-Line items –Cost centers: Actual line items (Transaction :KSB1)

Cost center select Dept A  (if you want change the posting dates)
Select execute button
Keep the cursor and the first line item
Select document button
Select back arrow
Select change layout button (Ctrl+F8)
Select Document no.under column set
Select value in reporting  currency under displayed columns
Select left arrow or show selected filed button
Select reference document no.under column set
Select value in report current under displayed columns
Select left arrow
Select business transition under column set
Select document no. under displayed columns
Select left arrow
Enter

To view co documents:
Path :Up to reports for costs center accounting path is same -Line items – Co documents :Actual costs (transaction code is KSB5)

Document no.             :1 to 100000
Execute
Select folder button for document no.1


Repost co line items:

Business transaction RKU3
FI doc.13
001      400100 Salaries           500000 Dept A           150000 Dept B
50000 Dept C

Report co line item
002      400300 Rent                           100000 Dept A
003      200105 SBI                             600000

Repost co line item
Transfer document wise /line item  wise , transfer line item wise
No FI document will be generated
Only document will be generated

Path: Accounting – Controlling-Cost center accounting –Actual postings-Report line items-Enter (Transaction code is KB61)

Select document no.   :13
Company code            :BIL
Fiscal year                   :2008
Execute
Double click on line item no.1
Amount under new account assignment 150000
Cost center                  :Dept B
Select new item button
Select next button
Amount under new account assignment 50000
Cost center                  : Dept C

Save

Go and see the cost center report KSB1

Give the cost center    Dept A 
Select execute button
To view cost element wise to total
Select cost element column
Select sub totals button
(Note:That is dues cost element wise total)

Repost costs (Business transaction RKU1)

This is used when we split a cost center in to number of cost centers or wrong cost center postings.
No FI document will be generated
Only CO document will be generated
Transfer cost element wise (GL account wise)

Path : Accounting-Controlling-cost center accounting –Actual postings-manual reporting of costs – Enter (Transaction code is KB11N)

Cost center (old)         : Dept A
Cost element 400100 Salaries
Amount                       :100000
Cost center new          : Dept C
One more cost center (old)     : Dept A
Cost element               :400300 Rent
Amount                       :25000
Cost center (new)        : Dept C
Enter
Select save button or Ctr+S

Period lock:

                                   

FI
CO
A) Transaction which effect FI and CO eg:COIN
To open
To open
B) Transaction which effect only CO Eg.RKU3, RKU1
No check
To open
C) Transaction which effect only FI Eg.Debit balance sheet and credit balance sheet 
To open
No check

Sept .08 March
Oct 2008 to March 2009

An expenditure posting in FI for September. We can’t post since periods are not open.

Path: Accounting – Controlling-cost center accounting-Environment –Period lock-chang (Tr.code is OKP1)

Controlling area                      : BIL
Fiscal year                               :2008
Select actual button
Select period                           :01
Select lock period button
Save

Set controlling area :(OKKS):

Path :up to Environment the path is same à Set controlling area

Give the controlling area         :BIL
Enter
Real time integration of controlling with FI on line reconciliation ledger
This is used when we get for 2nd scenario (no.of company codes having one controlling area ) all the company codes should use same Char of Accounts.

Planning cost center wise

Path :Accounting –Controlling cost center accounting –Planning –Cost and Activity inputs –Change (KP06)

Version                        :select 0 (Original budget)
From period                :1
To period                     :12
Fiscal year                   :2008
Select next page or page down button
Cost center group        :BILHIER
Cost element From      :400000
Cost element To          :499999

Free
Form Bsed
If we select radio button
If we select from based radio button
We have to select cost element from the drop down list and plan against the elements
The cost element list in a available on screen plant against cost  elements

Select form based radio button
Select overview screen button
For cost element 400100 Plan Fixed cost 1500000
Distribution key 1 Equal distribution
Select cost element     400100
From the menu select à Goto –Period screen
Select back arrow
Fro cost element 400300 Plan fixed cost 960000
Distribution key  1
To plan for Dept B –Select next combination button
To go back to previous dept –select previous combination button
Save


To view variance report cost center wise

Path :Accounting – Controlling-Cost center accounting –Information system –Reports for cost center accounting –Plan /Actual comparisons –Cost centers: Actual  /Plan/Variance (Tr code is S_ALR_87013611)

Controlling area                      :BIL
Fiscal year                               :2008
From period                            :10
To period                                 :10
Plan version                             :0
Cost center Value                   :Dept A
Execute
Keep the cursor on Salaries A/c actual costs amount 
Select call up report button
Double click on cost centers : Actual line items keep the cursor on the first line item.
Select document button 

No comments:

Post a Comment