Sunday 23 August 2015

what is actual costing in sap co


ACTUAL COSTING
CO consultant Job

Check costing variants for Manufacturing orders (PP)

Path :SPRO-Controlling –Product cost controlling -Cost object controlling –
product cost by order –Manufacturing orders –
Check costing variants for manufacturing orders(PP) (Tr.code is 0PL1)

Select costing variant PPP1 Production order plan
Select details button
Select valuation variant button
Select create button beside valuation variant /plant
Select new entries button
In plant                        :BILP
Save
Press enter to save in your request
Select back arrow
Select valuation variant           :006 with plant BILP
Select details button
Select overhead tab
Give the costing sheet             :BIL costing sheet
Save
Select back arrow
Select costing variant PPP2 production Order Actual
Select details button
Select valuation variant button
Select create beside valuation variant/plant
Select new entries button
In plant                                    :BILP
Save
Press enter to save in your request
Select back arrow
Select valuation variant 007 with plant :BILP
Select details button
Select overhead tab
Costing sheet              :select BIL costing sheet
Save

Define goods received valuation for order delivery:
Same path

Select new entries button
Valuation area                         :BILP
Valuation variant                    :007 production order -Actual
Save
Press enter to save in your request

Work in process customization

Creation of 5 secondary cost elements (Tr code is KA06)

Give the cost element                         :1100000
Valid from                              :01.04.2008 to 31.12.9999
Enter
Name & Description               :Order /Project result analysis
Cost element category            :select 31 (order /project results analysis)
Save
Cost element                           :1100001
Reference cost element           :1100000
Controlling area                      :BIL
Enter & Save

Cost element                           :1100002
Reference cost element           :1100000
Controlling area                      :BIL
Enter & Save
Cost element                           :1100003
Reference cost element           :1100000
Controlling area                      :BIL
Enter & Save
Cost element                           :1100004
Reference cost element           :1100000
Controlling area                      :BIL
Enter
Save

Define results analysis keys
Path :SPRO-Controlling –Product cost controlling –Cost object controlling –Product cost by order –Period end closing –Work in process –Define results-Analysis keys (Tr code is OKG1)

Result analysis key :FERT WIP calculation for production orders


Define results analysis versions(Tr  code  OKG9)
Same path

Select new entries button
Select controlling area                         :BIL
Technical result analysis cost element :select 1100000
Save
Press enter to save in your request

Define valuation method (Actual cost) ( Tr code is OKGC)
Same path
Select new entries button
Select actual cost button
Controlling area          :BIL
Result analysis version :0
Result analysis key      :FERT
Enter & Save
Press enter to save in your request

Define line Id’s
Same path
Purchase of to get the break up of WIP (Work In Progress)value
Select line ID EL (Revenues)
EK       Direct cost
FK       Production cost
ABR    settled cost for controlling area 1000

Select copy as button (F6)
Change the controlling area to BIL for all line ID’s
Enter & Save
Press enter to save in your request

Define Assignment  (OKGB)
Same path
Select line ID EL that is revenues for controlling area           :1000
Select copy as button
Change the controlling area to BIL
Change masked cost element to 00003+++++ (5 times plus)(300000 to 399999)
Enter & Save
Press enter to save in your request
Select line ID :EK Direct cost for controlling area 1000
Select copy as button
Change the controlling area to BIL
Change mass cost element to 00004000++
Enter and save
Select line ID FK that is production cost for controlling area 1000
Select copy as button
Change the controlling area to BIL

Production cost elements:
400100 -400199 Personnel                 00004001++
400200-400299 Manufacturing          00004002++
400500-400599 Depreciation                         00004005++
1200001 Activity allocation               00012+++++

Change master key cost element to 00004001
Enter & Save
Notes: for define assignment line ID brak up of WIP
Dept A            Dept B                                    ept C
Issue RM                                             work in progress
RM over head
Production costs         100000            200000
Calculate internally WIP by using secondary cost elements and transfer to financial accounting require the break up of WIP by using line ID’s and account assignments to line ID’s.

Select line ID FK production cost for controlling area BIL
Select copy as button
Change the mass cost element to 00004002++
Enter & Save
Select 2FK line ID’s for controlling area BIL
Select copy as button –Change masked cost element from first line ID 00004005++
Change to 00012+++++
Enter & save
Select bank arrow

Select line ID ABR Settled cost for controlling area 1000
Select copy as button
Change the controlling area to BIL
Change mass cost element to 0001000001 :(settlement cost element)
Enter & save

Define update; (Tr.code is OKGA)

Same path
Select new entries button
Controlling area          :BIL
Version                        :0
Result analysis key      :FERT
Line ID                       :select EL revenues
Category                     :select N (costs not to be included)
Controlling area          :BIL
Version                        :0
Result analysis key      :FERT
Line ID                       :Select EK (Direct cost)
Category                     :select K cost
WIP                             :1100001
Revenues                     :1100002
Controlling area          :BIL
Version                        :0
Revenues analysis key :FERT
Line ID                       :FK production cost
Category                     :select K cost
WIP creation               :1100003
Reserves creation        :1100004
Select page down button
One more controlling area :BIL
Version                        :0
Result analysis key      :FERT
Line ID                       :ABR settled cost
Category                     :select A (Settled cost )
Save
Press enter to save in your request

Creation of two GL Masters:

WIP entry

Work in process          DR                      BS               CA(Current assets, Loans &
Advances)
            To Increase /Decrease in WIP    P & L           Credit INC/DEC in stocks


FS00

Give the GL Account no.       :200123
Company code                        :BIL
Select with template button
Give the GL A/c No.200121 INV RM local
Company code            :BIL
Enter
Change short text to and GL A/c long text to work  in process
Other fields are common
Save

GL A/c No.300201
Company code :BIL
Select with template button
Give the GL A/c no.300200   Increase /Decrease stocks FG
Company code            :BIL
Enter
Change short text and GL A/c loge text to INC/DEC stocks – WIP (Work in Progress)
Save

Define posting result for setting work in process

Path :Up to period end closing the path is same –Work in process –Define posting results for setting work in process (OKG8)

Select new entries button
Controlling area          :BIL
Company code            :BIL
Result analysis version :select 0
Result analysis category :WIPR (Work in Process with requirement to Capitalized)
P & L A/c                    :300201
Balance sheet              :200123
Save
Press enter to save in your request

Define results analysis version (OKG9)
Same path

Select controlling area             :BIL
select details button
Select transfer to Financial accounting check box
Save
Ignore the warning message press enter
Press enter to save in your request


RM issue overhead production costs  Dept A                  Dept B      Dept D
                                                                                                            FG not received
Settle to accounts by using secondary costs elements break up WIP (BY using line IDs)

Define variance keys:

Path :Up to period end closing the path is same –Variance calculation :Define variance keys (OKV1)

Select variance key 00001 Production order 
Select copy as button
Change the variance key to BIL1
Change the name also variance key for BIL
Enter & Save

Define default variance keys for plants (OKVW)
Same path

Select position button
Give the plant             :BILP
Enter
For plant                      :BILP 
Assign variance key    :BIL1
Save
Press enter to save in your request

Define target cost version: (OKV6)

Notes:
Budgeted cost =Budgeted production Qty    *          Standard price

Standard cost =Standard quantity * Standard price

Target cost =Actual production qty    *          standard price

Actual cost =Actual Production *      actual price

Path :Same path

Select controlling area 1000 with target cost version 0
Select copy as button
Change the controlling area to BIL
Change the description to target cost version for BIL
Enter & Save
Press enter to save in your request

Assign variance key in Material master

Path :Logistics –Material management-Material master –Material –Change –Immediately (MM02)

Give the material no.BILFG1
Press select views button
Select costing 1 view
Enter
Give the plant             :BILP
Enter
Variance key   :select BIL1
Save

Creation of cost element group (KAH1)

Give the cost element group   :BILPRODN
Enter
Description                              :Production cost element for BIL
Select Edit-Cost element -Select insert cost element button
400100            400299            Personnel & Manufacturing
400500            400599            Depreciation
1200001                                  Activity allocation
Save


Create allocation structure:

Path :SPRO-Controlling –Product cost controlling- Cost object controlling –Product cost by order-Period end closing –Settlement –create allocation structure

Select new entries button
Allocation structure    :B2
Text                             :BIL Production differences allocation structure
Save
Press enter to save in your request

Select                          :B2
Double click on assignments folder
Select new entries button
Assignment                            Text
01                                            Direct costs(Raw materials)
02                                            Material overheads
03                                            Production costs
Save

Select assignment 01
Double click on source folder
From cost element       :400000
To cost element           :400099
Double click settlement  cost elements folder
Select new entries button
Receiver category       :select G/L, GL account
Select by cost element check box
Save

Double click on assignments folder 
Select assignment 02 Material overheads
Double click on source folder
From cost element       :1200000 RM overhead rate
Double click on settlement cost elements folder
Select new entries button
Receiver category       :select G/L , GL Account
Select by cost element check box
Save
Double click on assignment folder
Select assignment 03 production cost
Double click on source folder
Give the cost element group :BILPRODN
save
Double click on settlements cost elements folder
Select new entries button
Receiver category       :select G/L
Select by cost element check box
Save

Create settlement profile:
Same path

Select new entries button
Settlement profile       :BIL
 Description                 :BIL production order differences settlement profile
Select to be settled in full radio button
Allocation structure :B2
Default object type     :select G/L
Select % settlement check box
Select equivalence number check box
Select amount settlement check box
Under valid receivers for GL account :Select settlement required
Document type           :SA
Maximum no.of distribution rules :999
Residence time            :12 months
Save
Press enter to save in your request

Define CO.No.range interval for the business transactions

RKL    -Actual Activity Allocation
KZPI-  Actual overhead (Periodic)

User transactions code :KANK
Give the controlling area         :BIL
Select maintain groups button
Double click on RKL
Double click on KZPI
Select Co. No. range interval for BIL check box
From the menu select –Edit –Assign element group
Save
Ignore the warning message press enter

Define exchange rate for  type P (Standard truncation for cost planning for INR to EURO

(Transactions code OB08)

Select new entries button
Exchange rate type                 :P
Valid from                              :01.12.2008
From currency                         :INR
To currency                             :EUR
Direct quotation                      :0.02
Save
Press enter to save in your request

FI Consultant job
BILRM2         receipt

Purchase order            Opening stock
|
GR
|
IV

Inventory RM local                 DR                  BSX
            To Stock taking           GBB                BSA    Current liability & provision

Production order differences are to be settled to accounts
Production order differences manufacturing  DR      PRD
                        To INC/DEC in stocks FG GBB AUA


Creation of 2 GL masters (FS00)

Give the GL A/c No.400201
Company code            :BIL
Select with template button
Give the GL A/c No.  :400200 Conversion charges
Company code            :BIL
Change short text and GL account long text to production order differences
Select create /bank/Interest tab
Field status group change to G014 MM adjustment account
Save
GL A/c No.                 :100599
Company code            :BIL
Select with template button
Give the GL A/c No.100500 VAT payable
Company code            :BIL
Enter
Select type /Description tab
Chang short text and GL account long text to Stock taking
Select create /bank /interest tab
Change the field status group G049 (manufacturing cost accounts)
Save
Give the GL account no.300200 INC/DEC stock in FG
Company code            :BIL
Select edit cost element button
Valid from :01.04.2008 to 31.12.9999
Enter
Cost element category            :select 22 external settlement
Save


Assignment of account for automatic postings (OBYC)
(See the material )

Double click on transaction PRD Cost (Price) differences
Give the Chart of Accounts    :BIL
Enter
Save
Give A/c No.400201 production order differences
Save
Press enter to save in your request
Select back arrow
Double click on GBB offsetting entry for inventory posting
Valuation modifier      :X
General modification :BSA opening stock taking
Valuation class            :BIL1
Account no.                :100599 stock taking account
Valuation modifier      :X
General modification :AUA production
Valuation class            :BILL
Account                      :300200
Save
Press enter to save in your request

PP CONSULTANTS AREA

Define order type –Dependent parameters

Path :SPRO-Production –Shop floor control-Master data –Order-Define order type dependent parameters. (Tr code is OPL8)

Select plant     :1000 with order type PP01
Select copy as button
Change the pant to BILP
Enter and Save
Press enter to save in your request

Define scheduling parameters for production orders

Path :Up to Shop floor control the path is same- Operations-Scheduling –Define scheduling parameters for production orders (Tr code is OPU3)

Select plant                 :1000 with order type PP01
Select copy as button
Change the plant to BILP
Enter and save
Press enter to save in your request

Define confirmation parameters

Path :Up to shop floor control the path is same –Operations-Confirmation-Define confirmation parameters (OPK4)

Select plant 1000 with order type PP01
Select copy as button 
Change the plant to BILP
Enter and Save
Press enter to save in your request

Define checking control

Path :Up to shop floor control the path is same –Operations –Availability check –define checking control (OPJK)

Select business function          :1 & 2 for order type PP01 for plant 1000
Select copy as button
Change the plant to BILP
Enter
Change the plant to BILP
Enter and save
Press enter to save in your request

END USER AREA

Creation of production order:

Path :Logistics –Production-Shop floor control-Order –Create –with material (Tr code is CO01)
Give the material                     :BILFG1
Production plant                     :BILP
Planning plant                         :BILP
Order type                               :select PP01 Production order
Enter
Give the total Qty under quantities :10
Start date & end date :Today’s date
Select cost order button (Ctrl+F7)
From the menu select Goto àCosts –Analysis
Select back arrow
Select release order button (Ctrl+F1)
Save
From the menu select order display note the order no.60003225
Enter
Select assignment tab
Not  to the reservation no.66076

Raw material receipt by way of opening stock

Path :Logistics –Materials management –Inventory management –goods movement –Goods receipt –Other (Tr code is MBIC)

Give the movement type                     :561
Plant                                                    :BILP
storage location                                   :HYD
Enter
Give the material no.                           :BILRM2
Quantity                                              :100 kgs
Select save button or Ctrl+S
From the menu select other goods receipts display
Enter
Select accounting documents button
200121            Inventory RM LCL 15000 BILRM2                        BIL1   BSX
100599            Stock taking              15000 BILRM2                        GBB    BSA    BIL1

100*150



Raw material issue to production order:(Tr code is MB1A)

Select to reservation button
Give the reservation no.66076
Enter
                        Qty
BIL RM1        :15
BIL RM2        :15
Save
From the menu select goods issue display
Enter
Select accounting documents button
Select accounting document no.

200121            Inventory RM local     1125 BILRM1            BSX    BIL1

400000            RM consumption local 1125 BILRM1 GBB VBR    BIL1
                        Quantity consumed * Avg rate ( 15 *75)

200121            Inventory RM local 2250 BILRM2 BSX BIL1

                                                                                                GBB    VBR
400000            RM consumption local 2250                           BILRM2         BIL1
Qty consumed * Avg. rate (15*150)

Actual overhead calculation

Path :Accounting –Controlling –Product cost controlling –Cost object controlling –product cost by order –Period end closing –single functions –Overhead –Individual processing (Tr code is KGI2)

Give the order no.       :60003225
Period                          :9
Fiscal year                   :2008
Select text check box
Select dialog display check box
Execute
Select back arrow
Deselect text run check box
Execute


Work in process calculation

Path :up to single functions the path is same –Work in process –Individual processing –Calculate  (Tr code is KKAX)

Give the over no.        :60003225
WIP period                 :9
Fiscal year                   :2008
Result analysis version :select 0
Select test run check box
Execute
Select back arrow
Deselect test run check box
Execute
Settlement of work in process to accounts
(31.12.2008 (month end date)

Path :Up to single functions the path is same –Settlement of individual processing (Tr code is K088)

Give the order no.       :60003225
Settlement period        :9
Fiscal year                   :2008
Deselect text run check box
Select check transaction date check box
Execute
Select detail lists button
Select accounting documents button
Select accounting document no.

300201            INC/DEC in stock WIP 3713 P &L Account
200123            Work in Process 3713 Balance Sheet
(Actual RM +Actual RM overheads)


To view work in process report

Path :Accounting –Controlling –Product cost controlling –Cost object controlling –Product cost by order –Information system –Reports for product cost by order –Object list –Order selection  (Tr code is S_ALR_87013127)

Plant                                        :BILP
Material number                      :BILFG1
From period                            :01       2008
To Period                                :9         2008
Execute
Select report call button

Confirmation of production order
Path :Logistics –Production –shop floor control –Confirmation –Enter-For operation –time ticket (Tr code is Co11N)

Give the order no.                   :60003225
Operation /Activity                 :10 kg
Confirmation type                   :select final confirmation
Yield to confirm                     :10 kg
Fro activity 2 to confirm         :60 Qty
Unit                                         :H (Hour)
Save

Production receipt

Path :Logistics –Material management –Inventory management –Goods  movement –Goods receipt for order (Tr code is MB31)

Give document date               :31.12.2008
Posting date                            :31.12.2008
Give the movement type         :101 (Goods receipt for order into ware house)
Order                                       :60003225
Plant                                        :BILP
Storage location                      :HYD
Enter
Ignore the warning message press enter
Select save button or Ctrl+S
From the menu select goods receipt display
Document no.5000011861
Enter
Select accounting documents button
Select accounting document no.

200122            Inventory FG 2860     BILFG1          BSX    BIL2

                                                                                                GBB    AUF
300200            INC/DEC in stocks FG 2860 BILFG1          BIL2
                        Qty produced * standard rate
                        10*286
To make production order technically complete (TECO)

Path :Logistics –Production –shop floor control –Order –Change (Tr code is CO02)

Give the order no.60003225
Enter
From the menu select functions –Restrict processing –Technically complete
Save

Calculation of variances

Path :Accounting –Controlling-Product cost controlling –Cost object controlling –Product cost by order - period ending closing –single functions- Variances –Individual processing (Tr code is KKS2)

Give the order no.60003225
Select execute button
Select back arrow
Deselect text run check box
Execute
Double click on variance amount

Open one more session for order display (CO03)
Give the order no.60003225
Enter
From the menu select go to cost analysis

Calculation of work in process (KKAX)

Path :Upto single functions same path –Work in Progress –Individual processing-Calculate

Work in process for Dec
Production for Dec
To calculate WIP once again work in process will be reserved and variances will be settled to accounts
Give the order no.       :60003225
WIP to Period                         :9
Fiscal year                   :2008
Result analysis version:0
Deselect text run check box
Execute
Settlement of work in process to accounts :KO88
Give the order no.       :60003225
Settlement period        :9
Fiscal year                   :2008
Deselect test run check box
Select check transaction date check box
Execute
Select details list button
Select accounting documents button
Select accounting document no.
                                                                                    GBB    AUA
300200            INC/DEC in stocks FG 853 BILFG1                       BIL2
400201            Production order diff 853 period
300201            INC/DEC in stock WIP 3713 P & L debit
200123            work in process 3713 –Balance sheet credit



ASSET ACCOUNTING AREA


Capital work in progress line item settlement
Machine purchase                   Debit to CWIP            Machine no.15
01.12.2008                              Commission 13/12/2008

Freight charges 05.12.2008     settle from CWIP to respective asset
Commissioning charges 12/12/2008

Define settlement profile:

Path :SPRO-Financial accounting –Asset accounting- Transactions-Capitalization of assets under construction –Define /Assign settlement profiles (TR code is OKO7)


Double click on define settlement profile
Select settlement profile AI Settlement assets under construction
Select details button
Select to be settled in full radio button
Allocation structure :select A1( CO allocation structure)
Default object type     :select FXA asset
Select % settlement check box
Select equivalence numbers check box
Select amount settlement check box
Under valid reserves for fixed assets :Select settlement required
Document type                       :AA (Asset Posting)
Max no. distribution rules       :999
Residence time                        :12 months
Save
Select back arrow two times
Double click on assign settlement :Profile to company code
Select position button
Give the company code          :BIL
Enter
For company code BIL assign settlement profile AI
Save
Press enter to save in your request

Creation of  capital work in progress asset master (AS01)

Give the asset class     :BIL4000  capital work in progress
Company code            :BIL
Enter
Description                  :CWIP –General
Capitalized on             :01.12.2008
Select time dependent tab
Business area               :BILH
Select depreciation areas tab
Depreciation key         :0000 (no depreciation)
Save
Note down the asset no.500001-0

Asset purchase posting (F-90)

Give the doc .Date  & Posting date    :01.12.2008
Type                                                    :KR
Company code                                    :BIL
Posting key                                         :31
Vendor account                                  :2001
Give the amount                                 :600000
Business area                                       :BILH
Text                                                     :Machinery purchase posting
Posting key                                         :70
Account no.                                        :500001-0
Transaction type                                  :100 External acquisition
Remove the TDS codes
Enter
Amount                                               :*
Text                                                     :+
Document –Simulate & Save

Freight payment (F-02)

Give the Doc date & Posting date      :15.12.2008
Type                                        :SA
Company code                        :BIL
Posting key                             :70
Account                                  :500001-0
Transaction type                      :100
Enter
Give the amount                     :10000
Text                                         :Freight payment
Posting key                             :50
Account no.                            :200105 SBI current a/c
Enter
Amount                                   :*
Business area                           :BILH
Text                                         :+
Document –simulate & save

Creation of machinery master (AS01)

Give the asset class                 :BIL 2000 Dept A
Company code                        :BIL
Enter
Description                              :Machine no.15
Capitalized on to days date
Select time dependent tab
Business area                           :BILH
Select depreciation area tab
Depreciation key                     :BIL1
Useful life                               :15 years
Period                                      :6 months
Ordinary depreciation start date :Today’s date 
Save
Note: the asset no.200004-0

Settlement of CWIP to machine no.15

Path :Accounting –Financial accounting –Fixed assets –Posting-Capitalized asset under construction –distribute (Tr code is A1AB)

Company code                        :BIL
Asset                                       :500001
Sub number                             :0
Execute
From the menu select Edit –select –select all (F5)
Select enter button
Category                                 :select FXA asset
Settlement receiver                 :200004-0
Give the percentage                :100
Select back arrow
Save
Select settlement button (Shift +F8)
Give the asset value date        :13.12.2008 (Today’s date)
Text                                         :CWIP settlement
Deselect text run check box
Execute

Go and see the document  (FB03)
Enter


Note :In live environment you take a purchase of machinery don’t enter directly Asset account, first enter in Capital Work in Progress after commissioning added all charged  convert to asset accounting.

1 comment:

  1. This is an excellent post I seen thanks to share it. It is really what I wanted to see hope in future you will continue for sharing such a excellent post. Call center software solutions in Nigeria

    ReplyDelete